From: route@monster.com
Sent: Thursday, January 28, 2016 5:16 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
1-4
GEORGE PADURARU
.
♦ email: luispaduraru@hotmail.com ♦ SUMMARY About
20 years experience, including: ¨
Experience
in a wide variety of projects including telecommunication, gas and electric,
high objectivity, attention to detail and the ability to be unbiased and of
high ethical principles, able to provide good strategic advice, demonstrated
level of professionalism in dealing with clients, contractors and vendors,
extensive organization skills and ability to handle multiple concurrent
assignments. ¨
Experienced
in managing all facets of project management (budget, schedule, procurement,
quality & risk) for large and complex customer networks from the order’s
entry, through design, construction, FO management & equipment install,
acceptance test, service turn up, customer acceptance and billing. ¨
Experienced
in design, engineering, implementing and supporting telecommunications and
data network for medium to large enterprise with multiple remote offices
nation-wide. Production of feasibility studies and customized design of fiber
routes and facilities, tender contract and as-built drawings, splice &
network diagrams, optical certification documentation. ¨
Hands-on
experience in telecommunication distribution facility installation, FTTP/FTTB
network architecture deployment (EPON, GPON, ETD’s), restoration, audit
cables & cell sites, ring cuts (mid span) on live backbone cables, fusion
and mass fusion splicing, tests and inspection equipment including an
oscilloscope, OTDR and light source /power meter setups. ¨
GSM/UMTS/LTE
network integration/adaptation (AWS/PCS); experienced with various cell site
components and the steps necessary to isolate issues within them - jumpers,
TMA’s, N/DIN connections, diplexers/duplexers, sectorized/omni antennas,
surge arrestors, multiplexers, splitters, filters, etc. ¨
Proficient:
Outlook, Excel, Word, Access, Microsoft Project/EPM, Primavera, AutoCAD,
Microstation V8, MapInfo, MapPoint, Visio, Smallworld, Optix, Salesforce,
PowerPoint, GNNettest, NEST. EDUCATION ü
BS –
Civil Engineering / Ghe. Asachi Technical University / July 1994 CERTIFICATION o
Advanced
Techniques for Enterprise Project Management / Management Concepts / March
2010 o
AN
Microsoft Project 2003 Enterprise Project Management / System Source / July
2008 o
Fundamentals
of Project Management / Villanova University / June 2002 o
AutoCAD
R14 – Level 1 & 2 / Faculty Of Machine Building - ATC Autodesk GmbH /
March 2000 o
A+
Troubleshooting / Cox University / July 2006 o
OM
5100/5200 Operation and Maintenance / Nortel / May 2008 o
High
Speed Technologies Part 5-SONET/SDH / Cox University / September 2006 o
Cisco
Service Provider AM Metro Optical Primer: SONET Networks / Cox University /
August 2006 o
CMA
4000 User Training / GN Nettest / May 2001 o
Network
Solution / Light Tech / December 2000 o
Installation,
Splicing & Measuring in Fiber Optics Networks / Ericsson AB / April 1999 TRAINING Road
To A Sale / TK Worldwide / October 2013 Temporary
Traffic Control Managers / State Highway Administration / July 2001 / 2011 NEC
– 2 / IBEW Local 26 / December 2001 Other:
Ericsson FOLT Zambu 40201, Siecore terminating connectors, R-O-W WMATA, CSX
Transportation, Amtrak LANGUAGE English (fluently);
French (intermediate); Italian (intermediate); Romanian. EXPERIENCE SummitIG
Dulles, VA 12/14 – Present: Project Manager ¨
Oversee
completion of assigned project related to OSP & ISP, managed proposals,
bids, scope definition, engineering design cycles and design review and
approvals. ¨
Overall
management responsibility in large geographic area for activities such as
site walks, boring, trenching, micro-trenching, conduit placement, splicing
and testing of light level via optical loss test sets (OLTSs) and optical
time domain reflect meters (OTDRs). ¨
Installed
the largest capacity FOC (1728 fibers) ever deployed in US. ¨
Established
and lead initial conference call/visit to review contract obligations,
implementation process and installation timeline with account team and each
new customer/project. ¨
Created,
updated, and reviewed project schedule as needed ¨
Managed
capital budgets over $10MM. Projects:
Fortune 500 companies Lumos Networks
Pittsburgh, PA 7/14 – 11/14: Senior Network Planner ¨
Produce
technical documentation, reviews, planning guides for fiber optics projects. ¨
Provide
daily technical guidance and assistance to lower level and peer engineering
staff. ¨
Assist
the Planning Manager with budgets, project coordination, and provide input
for scheduling and network implementation of network related projects. ¨
Build
estimates/analysis develop fiber usage strategies and answer design and
implementation questions. ¨
Help
anticipate and prepare for bandwidth demands for customer services. Projects:
Small - Medium businesses, MDU’s Smartlink
Beltsville, MD 1/13 – 4/13: Construction Project
Manager III – Modernization (Contract) ¨
Identified
problems with project processes and recommends/implements solutions to
resolve and improve processes. Identified drawing specifications and meets
client standards. ¨
Planed
and scheduled project timelines and milestones using appropriate tools. ¨
Conduct
audits on completed cell sites using punch list methodology to ensure
completed work meets all building codes and laws. ¨
Assist
in Radio Frequency (RF) troubleshooting of cell sites to ensure site is fully
operational and meets required standards. ¨
Ensure
the completion of all site-specific construction activities pursuant to
design specifications and standards, familiar with site walks, both pre and
post construction. Projects:
T-Mobile AboveNet
MD / DC / VA 10/07 – 9/12: OSP Project Manager ¨
Managed
all facets of project management (budget, schedule, procurement, quality
& risk), implemented large and complex DWDM/CDWM, SONET, ATM, Frame
Relay, Ethernet, Fast Ethernet, IP customer networks – Off-Net & On-Net,
private & shared, managed & unmanaged - from the order’s entry,
through design, construction, equipment installation, customer acceptance,
service turn up and billing. ¨
Outward-facing
for assigned accounts, cultivate customer trust, served as primary point of
contact with customer, prepared and presented the project plan documentation
for complete client satisfaction, lead key project meetings with sales to
gather requirements, design an appropriate solution, set up project budgets
for both lump sum and unit cost and monitor / track all aspects of each
project from the start of the project through project close out. ¨
Managed
key decisions such as vendor selection, guidance on selecting equipment to
best meet customer needs, expediting scheduling of high profile projects to
maximize immediate reoccurring revenue, determined labor needs required to
staff project, ensure SP and vendors/ suppliers meet all the technical
specifications with respect to and customer specs, etc. ¨
Conducted
field inspection to ensure all, Abovenet, Federal, Local and customer safety
guidelines specification and construction procedure are enforced during the
entire CW phase. ¨
Prepared,
developed and maintained OSP relocation & implementation project plan
schedule, identified appropriate resources needed and assigned individual
responsibilities, assessed all project phases in alignment with contract
delivery due dates and customer requirements, ensure that all tasks are
completed and reported as committed. ¨
Lead,
planned, arranged and hosted a team building in executing of projects tasks
which result in improved communications within the office, provided
assistance and technical support in the development and design of new
projects, managed vendors/providers as required meeting the goals. ¨
Proactively
managed changes in project scope, identify potential issues/risks, and devise
contingency plans. Participate in the preparation and settlement of change
order proposals and claims including compilation of necessary supporting
documentation for time extensions. ¨
Assessed
and controlled charges to agreed design. Increased profit margins, maintained
project financial tracking, contain budgets overages by researching ways to
reduce expenses related to network deployment, reduce expenditure and
increase efficiency, diligent tracking any/all incurred change orders and
cost associated to achieve project objectives and meet customer expectations. ¨
Hands
on asset management, performed inventory adjustments, validate received
equipment, accountable for RMA’s. Projects:
Fortune 500 companies COX Communications
VA 4/06 – 10/07: Fiber Coordinator ¨
Lead
internal resources and cross-functional teams, provided technical support for
upgrade, extension, restoration, relocation and troubleshooting of all fiber
optic projects. ¨
Verified
serviceability, reviewed plans and ensure proposed construction design
deliver the cost efficient circuit routing and balance system deployment
limitation. Managed legacy database systems associated with fiber optic
mapping. ¨
Planed
and coordinate all FO allocation in COX NoVA system for MDU’s, commercial
customers, CATV expansion nodes, city I-net and other FO circuits as needed. ¨
Produced
technical documentation SEP’s, SOW and MOP’s for splice contractors. ¨
QC
construction drawings, as-built documentation and validated optical
certification documentation (OTDR) submitted by contractors. Projects:
Small - Medium businesses, MDU’s, I-net
KCI Technologies
MD / DC / VA 10/05 – 4/06: Senior Facility Designer ¨
Produced
CD’s, cross section profiles, permitting drawings, easement drawings for new
telecom duct. ¨
Performed
construction inspection on behalf of Verizon - Washington DC area. Projects:
engineering & construction– Verizon, Qwest, MFN Selectek
MD / DC / VA 3/05 – 9/05: Designer/CADD
(Contractor) ¨
Produced
CD’s for “Cingular UMTS Baltimore – Washington Corridor Upgrade” project -
based on approved structural, RF configuration datasheet, scope documents and
photo log. ¨
Calculated
1 phase/3 phase power panels load schedule. Identified, located/relocated
existing/proposed: equipments, antennas, TMA’s, ret systems, grounding, and
power/telco layout - inside shelter, outdoor platforms/concrete pad and
elevations (rooftop, monopole tower). Projects:
AT&T Mobility JJB Network Technologies
MD/ DC / VA / East Coast 2/01 – 2/05: OSP Engineer ¨
Prepared
AutoCAD ED’s/CD’s, splice diagrams, site surveys, feasibility studies, map
routing, facility access points, power supply for equipments, cable and drop
wire selection process, sketches & site photo log for new conduit design ¨
Hands-on
experience in troubleshooting and emergency FO restoration, various types of
tests and inspection equipment, including an OTDR and light source /power
meter setups. ¨
Prepared
ring cuts on live backbone cables, spliced (fusion and mass-fusion) any cable
construction up to 864ct in any environment and type of splice enclosures
(Raychem, Coyote, Keptel, 3M, Lucent). Projects:
engineering & construction – MFN, OCTO, Comcast, Level 3, I-net. splicing/testing - Qwest, MFN,
MCI/WorldCom, VDOT (I395/I66 - MTLS), StarPower, Cox Communications NoVA,
Comcast, Level 3, Adelphia, Arbros, RCN Communications, TWC, eSpire. Comproiect
RO 7/99 – 8/00: Project Engineer ¨
Designed
and engineered natural gas distribution systems to supply Copper Wall -
Mounted Gas Fired ¨
Boiler
for Central Heating and Hot Water Production with Electronic Flame Ignition
and Control (Hydronic Heating) for Single and Multi-Dwelling Units,
Commercial, Light Industrial, Schools, Museums, Churches, Hospitals and
Hotels. ¨
Designed,
verified and approved natural gas distribution piping systems. ¨
Prepared
bidding documents, proposals & cost breakdowns, reviewed plans &
specifications. ¨
Technical
expertise in metallic jointing, pressure pipes splicing and testing. ERICSSON
RO 9/96 – 7/99: Civil Work and Cable
Engineer Supervisor ¨
Served
as primary liaison with prime contractor country supervisors, partners and
vendors. ¨
Identified
and escalate minor’s conflicts, negotiate costs and performance to meet
budget goals and project requirements. ¨
Prepared
executed work plans for all phases of the project. ¨
Executed
segment testing and acceptance tests for telecom duct, fiber optic cable and
equipment in accordance with the valid project specification stated in the
contract. ¨
Organized
and directed teams of engineers, surveyors, drafters and workmen. ¨
Produced
redline drawings, approved modification of proposed design and routing for
compatibility, submitted site orders and coordinate assets movements. References
Available Upon Request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
French |
Advanced |
|
|
Italian |
Intermediate |
|
|
|